跳到主要内容
D4 · WHEN THE ROUTE CROSSES WATER

Floating bridges and work platforms

The bridge is out, or there is no dock. I need people, vehicles or equipment across.

Modular floating structures that assemble on site without piling, dredging or marine construction.

一句话结论

Floating structures avoid the two things that make water work expensive: foundations and heavy marine plant. Modules assemble into a bridge, dock or work deck sized to the job, and disassemble with nothing left in the riverbed. The global floating pontoon bridge market runs about USD 2.5 billion a year and grows at four to five percent.

典型场景

  • Emergency crossings where a bridge is damaged
  • Landing and berthing where no dock exists
  • Marine construction work decks
  • Floating solar and aquaculture platforms
  • Scenic waterside walkways
  • Diving and salvage support

本类目下的产品

11

floating dock — product view on a plain background

floating dock

临时码头

可浮于水面的临时靠泊设施。

inflatable floating bridge — product view on a plain background

inflatable floating bridge

充气浮桥

由多节浮体拼接而成的临时过河通道,可通行人员与车辆。

floating walkway deployed on site, in use

floating walkway

浮动栈道

水面上的步行通道。

floating helipad deployed on site, in use

floating helipad

浮动直升机坪

水面上的直升机起降平台。

landing platform deployed on site, in use

landing platform

登陆平台

岸滩与浅水区的人员装备上下平台。

vehicle crossing mat deployed on site, in use

vehicle crossing mat

车辆过河垫

车辆通过软基与浅水段的临时承载垫。

floating solar platform deployed on site, in use

floating solar platform

光伏浮台

水面光伏电站的浮体基础。

aquaculture platform deployed on site, in use

aquaculture platform

养殖浮台

水产养殖用的浮动作业与设施平台。

marine construction platform deployed on site, in use

marine construction platform

水上施工平台

水域工程的作业与堆料平台。

floating work platform deployed on site, in use

floating work platform

浮动作业平台

水面上的施工与作业平台。

diving platform deployed on site, in use

diving platform

潜水作业平台

潜水作业的水面支持平台。

查看全部产品

The figure we will not estimate

Load capacity is the whole question for a bridge or work deck, and it is a structural calculation rather than a marketing number. Distributed load and point load are different figures. Current, water level variation and anchoring change the answer for every site. We do not publish load ratings without calculation and test data, and a supplier who quotes one over the phone is guessing with your project.

对比 发送项目信息

本页更新于 2026-08-28

把用途说清楚
我们回复现在能拿出什么证据

现阶段我们不报价。把用途、使用环境和数量发过来,我们会回复:哪些现在就有据可查、哪些需要先送检、哪些我们会直接谢绝。这个答复不收费,而且是实话。

发送项目信息